Piling work for Construction of Cheliagada Bridge, Odisha - 1200mm DIA Piles

M/s SSNR Projects Private Limited, Visakhapatnam.

    • Boring of 1200m DIA Piles in all kinds of SOILS including all materials, machinery, labour, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing, dewatering, desilting, bailing out water etc.
    • Boring of 1200m DIA Piles in HARD ROCK including all materials, machinery, labour, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing, dewatering, desilting, bailing out water etc.
    • Pouring of concrete for piles including all materials, machinery, labour, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing, dewatering, desilting, bailing out water etc.
    • Straightening, cutting, bending, binding and lowering/placing of reinforcement steel in all sizes and shapes (cage) in position etc.,
    • Cutting, bending, welding (all fabrication works) and driving of 8mm thick M.S. liner in position for piles etc.,

Project Gallery