- Boring of Vertical piles dia 600mm & concreting with M25 grade concrete, using OPC/PSC 43 grade cement, incl. mobilizing, commissioning piling rigs, plant & equipment & demobilizing after completion.
- Boring of Vertical piles dia 600mm & concreting with M25 grade concrete, using OPC/PSC 43 grade cement, incl. mobilizing, commissioning CONVENTIONAL piling rigs, plant & equipment & demobilizing after completion.
- Chiseling through Hard Rock incl. Mobilizing, commissioning conventional piling rigs, plant & equipment & demobilizing after completion.
- Taking delivery, handling, transport, de-coiling, cutting, bending, fabricating as per drawings, of HYSD Reinforcement bars to IS:1786, including supply & tying with black annealed 18/20 SWG Wire.
- Excavation for foundation & disposal of surplus earth outside campus with lead of 1 km. incl. depositing on bank, shoring, strutting, barricading, danger lighting etc.
- , Conducting INTEGRITY TESTS, STANDARD PENETRATION TEST (SPT) in ROCK, INITIAL VERTICAL COMPRESSION LOAD TEST, INITIAL CYCLIC LOAD TEST, ROUTINE VERTICAL COMPRESSION LOAD TEST, ROUTINE HORIZONTAL LOAD TEST.